Page 10

Groundwater monitoring wells being installed on Tuscarora Nation Territory by NYPA to monitor groundwater movement around the Niagara Power Project Reservoir.

Fighting the mud & rain.  An all-terrain drilling rig ( Left) is used to access new well locations, placed around the Lewiston Reservoir and on the Tuscarora Nation.

 

Drilling through topsoil (right) and into the first five feet of bedrock to set an 8” well casing.

The well casing will set for 24 hours before continuing to drill.  A 5’ core sample is taken from the upper Lockport Dolmite. (Left)

Examining the first core for  fractures in the geology  below us.  Each fracture in the core may be monitored by individual 2” wells.

 

Water and air are injected in to the well to determine which fractures may transmit the flow of ground water.  The wells are  designed to study the Lockport Dolomite, at depths of 30 to 100 feet on the Nation. Below the Lockport formation lies an impermeable Rochester Shale formation.

Page Index

1/2/3/4/5/6/7/8/9/10/11/12

NEXT PAGE

Tuscarora Environment News
Copyright © 200
3 Tuscarora Nation and Tuscarora Environmental Program All Rights Reserved.

Return to the Main page by Clicking on the Home Icon Below

Counter provided by www.digits.com